Collection: Beauty & Personal Care
-
SHONDE Heat Resistant Gloves Three Finger Mittens Hair Styling Curling Wand Protector Gloves For Barbers And Hair Straightening Black Two Pieces
Regular price Rs. 1,389.00Regular priceRs. 0.00Sale price Rs. 1,389.00 -
Conair Double Ceramic Triple Barrel Curling Iron Hair Waver Tool For Deep Continuous Mermaid Waves White And Rose Gold
Regular price Rs. 3,819.00Regular priceRs. 0.00Sale price Rs. 3,819.00 -
Bed Head Helen Of Troy A Wave We Go Tourmaline Ceramic Adjustable Hair Waver For Multiple Wave Styles Multicolor 1 Count
Regular price Rs. 5,119.00Regular priceRs. 0.00Sale price Rs. 5,119.00 -
Mermade Hair PRO Hair Waver Thirty Two Millimeter Three Barrel Curling Iron One Point Twenty Five Inch Ceramic Hair Waver Tool With Heat Glove Black
Regular price Rs. 7,079.00Regular priceRs. 0.00Sale price Rs. 7,079.00 -
Bed Head Wave Affair Jumbo Three Barrel Hair Waver With Tourmaline Ceramic Technology And Heat Protectant Glove For Beachy Waves
Regular price Rs. 4,919.00Regular priceRs. 0.00Sale price Rs. 4,919.00 -
Farery Mini 3 Barrel Hair Waver Ceramic Tourmaline Beach Wave Curling Iron For Short Hair Pink
Regular price Rs. 3,789.00Regular priceRs. 0.00Sale price Rs. 3,789.00 -
Wavytalk Power Wave Hair Crimper And Curling Iron Waver For Women With Ionic Frizz Reduction And Ventilation Design Pink
Regular price Rs. 10,409.00Regular priceRs. 0.00Sale price Rs. 10,409.00 -
L'ANGE Hair VersaWaver Adjustable Titanium Waver Two In One Three Barrel Hair Styling Tool And Crimper With Heat Resistant Glove And Mat Blush
Regular price Rs. 9,859.00Regular priceRs. 0.00Sale price Rs. 9,859.00 -
Hot Tools Pro Artist 24K Gold Digital 3 Barrel Hair Waver For Long Lasting Defined Waves Jumbo Size Black And Gold
Regular price Rs. 8,189.00Regular priceRs. 0.00Sale price Rs. 8,189.00 -
RAKUKOKKU 4 in 1 Hair Crimper and Deep Waver Tool with 3 Rose Gold Ceramic Barrels Adjustable Depths and 4 Temperature Settings (Gold)
Regular price Rs. 4,749.00Regular priceRs. 0.00Sale price Rs. 4,749.00 -
CAKKA Cordless Curling Iron Brush 3 In 1 Travel Hair Curler And Straightener Brush With 7000mAh Rechargeable Battery And 4 Temperature Settings
Regular price Rs. 7,279.00Regular priceRs. 0.00Sale price Rs. 7,279.00 -
Janelove 4 in 1 Hair Crimper and Hair Waver Curling Iron with Ceramic Tourmaline Coating and Adjustable Wave Sizes in Pink
Regular price Rs. 5,749.00Regular priceRs. 0.00Sale price Rs. 5,749.00 -
CHI Vibes Wave On Multifunctional Waver And Curling Iron With Rose Gold Ceramic Plates For Crimp Style Waves And Beachy Curls
Regular price Rs. 7,959.00Regular priceRs. 0.00Sale price Rs. 7,959.00 -
Janelove Mini Hair Crimper One Half Inch Beach Waves Curling Iron Ceramic Triple Barrel Hair Waver For Short And Medium Hair Purple
Regular price Rs. 2,649.00Regular priceRs. 0.00Sale price Rs. 2,649.00 -
Bed Head Surf’s Up Waver For Relaxed Beachy Waves Multicolored Hair Styling Tool With Two Inch Double Tourmaline Ceramic Barrels
Regular price Rs. 3,759.00Regular priceRs. 0.00Sale price Rs. 3,759.00 -
MiroPure Waves Curling Wand 1 Inch Ceramic Triple Barrel Hair Crimper Waver Iron with Fast Heating and Dual Voltage for Women, Blue
Regular price Rs. 6,579.00Regular priceRs. 0.00Sale price Rs. 6,579.00 -
Mermade Hair Double Wave One Inch Deep Hair Waver Tool Ionic Ceramic Two Barrel Curling Iron For Women Pink
Regular price Rs. 9,919.00Regular priceRs. 0.00Sale price Rs. 9,919.00 -
Revlon 3 Barrel Jumbo Hair Waver with Tourmaline Ceramic Coating for Long Lasting Natural Looking Beach Waves Pink 1 Count
Regular price Rs. 4,729.00Regular priceRs. 0.00Sale price Rs. 4,729.00 -
Kuwa Crimper Hair Tool With 15 Variable Temperature Settings And LCD Display Rose Gold 3 Barrel Curling Iron Hair Waver For Women
Regular price Rs. 3,159.00Regular priceRs. 0.00Sale price Rs. 3,159.00 -
Conair InfinitiPRO Triple Barrel Waver Curling Iron Three Barrel Hair Waver For Medium To Long Hair Dual Voltage Gray
Regular price Rs. 5,569.00Regular priceRs. 0.00Sale price Rs. 5,569.00 -
CHI Ceramic Triple Waver Iron Gold Ceramic Three Barrel Hair Curler And Waver For Long Lasting Frizz Free Beachy Waves And Curls
Regular price Rs. 4,669.00Regular priceRs. 0.00Sale price Rs. 4,669.00 -
Rozamor Three Barrel Curling Iron Hair Crimper Hair Waver With Titanium Barrels And Five Temperature Settings Black One Inch
Regular price Rs. 5,179.00Regular priceRs. 0.00Sale price Rs. 5,179.00 -
Youuish Mini Hair Crimper Four Temperature Adjustable One Half Inch Small Three Barrel Curling Iron Hair Waver Travel Size In Rose Pink
Regular price Rs. 3,379.00Regular priceRs. 0.00Sale price Rs. 3,379.00 -
Trademark Beauty Babe Waves Three Barrel Hair Waver Curling Iron 1.25 Inch Jumbo Ceramic Tourmaline Beach Waves Curler Pink
Regular price Rs. 8,299.00Regular priceRs. 0.00Sale price Rs. 8,299.00 -
Vodana Professional Triple Flow Ceramic Hair Waver Embedded Double Barrel Deep Wave Iron Creamy Blue 1.6 Inch
Regular price Rs. 11,089.00Regular priceRs. 0.00Sale price Rs. 11,089.00 -
WEEYUM 1 1/4 Inch Hair Waver Crimper Deep Wave Iron with 2 Ceramic Barrel Hair Styling Tool for Women Pink
Regular price Rs. 3,829.00Regular priceRs. 0.00Sale price Rs. 3,829.00 -
TYMO ROVY Beach Waves Hair Waver Curling Iron Pink 1.25 Inch Ionic Deep Ceramic Three Barrel Hair Crimper Tool With Dual Voltage And Anti Scald Design
Regular price Rs. 5,559.00Regular priceRs. 0.00Sale price Rs. 5,559.00 -
Vodana Compact Triple Flow Hair Waver Ceramic Double Barrel Curling Iron For Beach Waves Ivory Mood 1.5 Inch
Regular price Rs. 6,829.00Regular priceRs. 0.00Sale price Rs. 6,829.00 -
ANWA Double Barrel Hair Waver Crimper Tool One Inch Twenty Five Millimeter Ceramic Deep Beach Wave Curling Iron For Women Black
Regular price Rs. 3,389.00Regular priceRs. 0.00Sale price Rs. 3,389.00 -
AmoVee Three Barrel Curling Iron Hair Waver Tourmaline Ceramic Mini Hair Crimper With Negative Ions Pink Zero Point Fifty Nine Inch
Regular price Rs. 2,529.00Regular priceRs. 0.00Sale price Rs. 2,529.00 -
Ion Titanium Pro Triple Barrel Waver Hair Crimper For Long Lasting Beach Waves Purple One Size
Regular price Rs. 5,919.00Regular priceRs. 0.00Sale price Rs. 5,919.00 -
Asani Kuwa Three Barrel Curling Iron Hair Crimper with LCD Temperature Display Dual Voltage Beach Waver Curling Iron In Black
Regular price Rs. 3,079.00Regular priceRs. 0.00Sale price Rs. 3,079.00 -
Aimery Hair Crimper Waver Curling Iron with Negative Ionic Technology French Anti Scald Ceramic Two Barrel Hair Styling Tool for Mermaid Waves Pink
Regular price Rs. 2,889.00Regular priceRs. 0.00Sale price Rs. 2,889.00 -
Drybar The Beach Bender Triple Barrel Waver Ceramic Hair Styling Tool For Effortless Tousled Waves
Regular price Rs. 15,579.00Regular priceRs. 0.00Sale price Rs. 15,579.00 -
Mane Mane-tain The Waves Kit 1.25 Inch 3 Barrel Hair Waver Styling Attachment And Power Bottom Base 2 Count
Regular price Rs. 13,629.00Regular priceRs. 0.00Sale price Rs. 13,629.00 -
VAV Cordless Hair Straightener Brush 2 In 1 Curling And Straightening Comb With 200 Million Negative Ions Mini Travel Hot Styling Brush Lavender
Regular price Rs. 12,499.00Regular priceRs. 0.00Sale price Rs. 12,499.00



































